Moipu sorting clamp is attached to the existing bank. Mounting is easy and fast. If needed, the sorting clamp can be re-installed in another forwarder. Installation of two sorting clamps takes approximately 15 min.
- Makes the forwarder more efficient
- Easy and fast installation in almost all forwarders
- Affordable solution without expensive changes to the loading space
- When the sorting clamp isn't needed, it can be lowered to the side of the bank. This way it doesn't take any room from the loading space
- Postition (up – down) of the sorting clamp can be quickly changed with crane using grapple or tree